FAAC Welding & Fabrication Nationwide | Latch & Post Gate Repair

Every visit starts with

Free on-site gate assessment - hinges, posts, and your LiftMaster or Nice gate operator checked before anything is quoted

The assessment is free and the quote is the invoice.

Styles & brands we work with

Wrought iron
Wrought iron
Wood & steel frame
Wood & steel frame
Farm & ranch
Farm & ranch
Sliding driveway gates
Sliding driveway gates
LiftMaster operators
LiftMaster operators

Before & after – our own jobs

Before - Recent ProjectBeforeAfter - Recent ProjectAfter
Recent Project
Before - Full RestorationBeforeAfter - Full RestorationAfter
Full Restoration
Before - Complete UpgradeBeforeAfter - Complete UpgradeAfter
Complete Upgrade

FAAC Welding & Fabrication: The Los Angeles Owner’s Guide

We stock and install FAAC-compatible welded assemblies and fabricated brackets across Los Angeles, with most welding and fabrication repairs running between $180 and $650 installed depending on the part and the access. Same-day service is available for most weld repairs, because a broken FAAC gate bracket isn’t something you can schedule around. The way owners usually find us is this: the gate starts dragging on one corner, or one leaf sags just enough to catch the driveway, or the FAAC operator whines and trips its thermal overload because the mechanism is fighting a twisted frame.

Call (626) 649-4572

We’re an independent gate repair shop, not affiliated with FAAC. But we’ve been welding FAAC-equipped gates since before half the operators on the market moved to DC motors, and we carry the common mounting plates, hinge brackets, and gate leaf reinforcements on our trucks. Cody Beckman grew up in Palms, three blocks from the Expo Line tracks, and the first gate he ever welded was his own family’s back fence. That gate sagged for years because nobody reinforced the hinge stile. We know where FAAC gates fail, and we know how to fix them so they don’t fail the same way twice.

Which FAAC Models This Applies To

FAAC’s residential and light-commercial lineup follows a few series families, and the welding and fabrication needs differ by which family you own. The 400 series (like the 412 and 422 operators, often paired with swing gates) uses a welded steel mounting post plate that’s typically 3/16-inch thick, and we’ve matched replacements for the S450H and S418 models across Los Angeles driveways from West Adams up to Encino. The 770 and 844 series, which show up a lot on multi-family properties and larger estate gates, run heavier gate panels, and those panels almost always need reinforcement when the original builder undersized the frame.

The compatibility gotcha with FAAC is the articulation geometry: FAAC swing operators are designed for specific mounting-hole spacing, and if someone welds a universal bracket on and the pivot point drifts even half an inch, the operator’s crank arm binds and burns out. We measure the center-to-center hole spacing on the existing mount before we touch anything. For leaf fabrication, the key number is the gate’s cantilever weight: a steel gate over about 700 pounds should have a diagonal brace welded into the frame, and we see a lot of Los Angeles properties where that brace was skipped. If you’re deciding between an OEM FAAC bracket and a quality aftermarket one, we’ll tell you honestly: for the operator-to-post connection, we stick with OEM or a machined equivalent that matches the hole pattern exactly. For gate leaf steelwork, we use 11-gauge or 1/8-inch tube and schedule 40 pipe to match or exceed the original frame dimensions, and that’s almost always better than the factory gate the builder hung.

Signs Your FAAC Welding & Fabrication Is Failing

  • One gate leaf drops when it opens past halfway. The hinge-side weld or the hinge barrel itself is fatiguing. LA’s dry heat does less to steel than coastal salt air, but thermal cycling still expands and contracts every weld joint, and on gates that face the afternoon sun on the hinge side, the top hinge weld almost always goes first.
  • The FAAC operator trips or grinds but the gate barely moves. The operator is fighting a frame that’s out of square. When a corner weld breaks or a stile twists, the operator’s current draw spikes. We see this most on older FAAC 770 installs in Valley Village and Studio City where the gate was fabricated light.
  • You hear a sharp snap near the post, then the gate hangs loose. That’s a broken mounting bracket or a snapped weld at the post plate. The tell is a fresh, bright metal surface at the break. This isn’t a DIY re-weld; the existing metal needs to be ground back and the load path re-established, or it’ll just snap again.
  • The gate leaf wobbles side to side while moving. Your cross-brace or diagonal member has separated from the frame. In Los Angeles, many builders weld the brace on the inside face only, and years of wind off the canyons eventually pops that single weld. We reinforce both faces.
  • Rust blooming at the bottom rail, especially near the hinge post. Water pools at the kickboard and capillary action draws it up into the tube. We’ve repaired gates in Pacific Palisades where the bottom rail looked fine from five feet away and was paper-thin inside. The fix is cutting out the rotted section and splicing in fresh stock, then treating and coating the inside.

Replacement Cost & What’s Included

What you’ll pay in Los Angeles depends on which FAAC part failed and how much fabrication the fix requires. Here’s the honest range we quote:

  • Mounting bracket or post plate re-weld (common 400-series fix): $180 to $320 installed, including grinding, welding, and anti-corrosion coating
  • Gate leaf reinforcement (adding a diagonal brace or replacing a rotted bottom rail): $280 to $520 installed, depending on steel length and whether we need to match an existing powder coat
  • Hinge barrel or hinge plate replacement with weld-in new steel: $220 to $420 installed, including re-aligning the gate to plumb
  • Full-frame rebuild for a badly twisted or rusted leaf: $450 to $650 installed, which covers cutting out failed sections, new steel, and welding everything square to the operator’s travel arc

Every price is written and agreed before any welding starts. You’ll see the exact number with parts and labor separated, and nobody touches a grinder until you’ve approved it. We lay drop cloths where the sparks or slag could reach, and we sweep and vacuum the weld area before we leave. All of this falls under our 365-Day Done Right Promise: if the weld or the alignment isn’t right, we come back and make it right with no argument. The promise covers the part and the labor for a full year.

DIY or Call Us?

What you can safely do: look at the gate. Check whether the hinge-side post is plumb, whether there’s fresh rust powder under the bottom rail, and whether the gate leaf is visibly twisted. Take a photo of the FAAC model plate on the operator and a photo of the failed area. That saves us a trip and lets us bring the right steel on the first visit.

What you shouldn’t do: fire up a flux-core welder and try to glue a broken bracket back on. Welding on a gate that still has a live FAAC operator connected, or a gate under tension, is dangerous. So is welding zinc-coated steel without proper ventilation. And here’s the practical reality of Los Angeles: even if you get a decent bead down, a misaligned gate will burn out your FAAC operator within months. The operator is too expensive to gamble on a weld that’s off by three degrees. Call (626) 649-4572 and we’ll quote it over the phone, then send a technician who can handle the electrics, the steelwork, and the cleanup. The gate should open quietly and close all the way. That’s really the whole job.

FAQs

Need Gate Repair help nationwide? Licensed & insured · within the hour response · free estimates
Call (626) 649-4572
Areas We Serve

Request a Free Estimate

Tell us what you need - Latch & Post Gate Repair responds fast. No obligation.

When you submit this form, you accept our Privacy Policy and agree that you may be contacted via phone, email, or SMS about your request, including by the independent contractors we may refer it to.

Prefer to text? Text Now
Call Now - 24/7 Dispatch